Projects - Cityförster
Por um escritor misterioso
Descrição
Building on existing structures.The plot of Bar Center in Fier (Albania), located next to our projects Rinia Complex and Building Block on a central urban intersection and adjacent to an inner-city park, was occupied by an existing building from the late 1990s. This building – the plinth of an unfinished high-rise, which stood at three storeys high – was unassuming and unfitting for this prominent location; therefore, the owners approached us to extend the building and upgrade the existing floors. So we used the volume of the existing building as a starting point for the design.The addition activates the upper floors and makes them directly accessible from the new main square of Fier, to which the building now prominently orientates. The result is a stepped five-storey volume enclosed in a geometrical, rasterized façade. This geometrical façade, in turn, is partially clad in semi-transparent golden shading sheets, which function as a screen against the sunlight. Additionally, they bring more unity to the building
Rubberhouse by Cityförster
Projects - Cityförster
Projects - Cityförster
News - Cityförster
A proposed urban plan on the periphery of Berlin places landscape design at its core
Projects - Cityförster
A proposed urban plan on the periphery of Berlin places landscape design at its core
Masterplan Dietenbach, Transsolar
CITYFÖRSTER on Architizer
CITYFÖRSTER
de
por adulto (o preço varia de acordo com o tamanho do grupo)